2025 Collection System Rehabilitation Project
Status
Bidding Closed
Prebid Date | 10/29/24 10:00am |
Bid Date | 11/20/24 2:00pm |
Location
Napa, CA
The general scope of work for this project included in the base bid and bid alternate is the rehabilitation and/or replacement of 6”, 8”, 10”, 12”, 14”, 16”, and 20” sewer mains by the following methods:
• Approximately 35,089 LF by cured in place pipe (CIPP) lining
Also included in the scope of work is the rehabilitation or replacement of approximately 619 laterals and installation of approximately 605 top hats and 248 cleanouts, and removal and replacement of approximately 6 flush holes.
Estimated Cost of Construction: $4.4 Million Base Bid , $780,000 Bid Alt.