Public Projects

Bids Due in 31 days
1/21/25 2:00pm
2025 Sanitary Sewer Manhole Adjustment Project (CIP 13702)
Bids Due in 31 days
NapaSan
Napa, CA
Project Description: Adjustment of sanitary sewer manholes and sanitary sewer flush holes and drop connections to grade on various streets within the City of Napa that have been paved over with approximately 2.5 inches of HMA,. A valid Class A, Class C-34, or Class C-42 California contractor's license is required to bid on the Project.
Bidding Closed
11/20/24 2:00pm
2025 Collection System Rehabilitation Project
Bidding Closed
NapaSan
Napa, CA
Bidding Closed
3/12/24 2:00pm
WWTP Site Paving Project (CIP 22718)
Bidding Closed
NapaSan
Napa, CA
Bidding Closed
2/13/24 2:00pm
Outfall Abandonment Project (CIP 23743)
Bidding Closed
NapaSan
Napa, CA
The general scope of work for this project included in the base bid are as follows: (1) removal and replacement of existing tide gates; (2) partial demolition and retrofitting of a 72-inch corrugated metal pipe riser (Outfall #2); and (3) complete demolition and removal of 54-inch, 12-gauge, asbestos lined and bituminous coated corrugated metal outfall piping and fittings (Outfall #3). Also included in the scope of work as a bid alternate is the partial demolition/removal and abandonment in place of three (3) 21-inch, 14-gauge, asbestos lined and bituminous coated corrugated metal outfall piping, abandonment of 36-inch, 14-gauge, asbestos lined and bituminous coated corrugated metal piping and demolition and abandonment of a 72-inch corrugated metal pipe riser.
Bidding Closed
12/19/23 2:00pm
North Napa Trunk Rehabilitation Phase 1 - CIP (23704)
Bidding Closed
NapaSan
Napa, CA
Project Description: The work includes rehabilitation of approximately 1,810 LF of 39-inch trunk sewer mains by Cured-In-Place Pipe (CIPP) lining and the rehabilitation of 5 trunk manholes within the project area. Also included in the scope of work as Bid Alternate B is the rehabilitation of approximately 910 LF of 39-inch trunk sewer mains by CIPP lining and the rehabilitation of 3 trunk manholes within the project area. Also included in the scope of work as Bid Alternate A and C is the use of non-styrene, no VOC CIPP resin for the CIPP lining work in the Base Bid and Bid Alternate B, respectively.
Bidding Closed
12/5/23 3:00pm
2024 Collection System Rehabilitation Project (CIP 23703)
Bidding Closed
NapaSan
Napa, CA
Bidding Closed
10/31/23 2:00pm
West Napa Pump Station Redundancy Project CIP 23710
Bidding Closed
NapaSan
Napa, Ca
Project Description: Installation of a 3rd large submersible pump at the recently reconstructed West Napa Pump Station, which includes piping modifications and electrical and instrumentation work. Also included in the scope of work is the following: installation of a sump pump in the flowmeter vault, installation of safety grates, installation of lighting mounted to the solar structure, installation of door switches connected to SCADA, installation of bird netting for the underside of the solar structure, and installation of a platform for the existing odor control unit and generator.
Bidding Closed
8/25/23 2:00pm
RFQ - Sanitary Sewer Manhole Adjustment Project, Phase XIII (CIP 13702)
Bidding Closed
NapaSan
Napa, CA
Adjustment of sanitary sewer manholes and sanitary sewer flush holes to grade on various streets within the City of Napa that have been overlaid with approximately 2.5 inches of asphalt concrete. A valid Class A, Class C-34, or Class C-42 California contractor’s license is required to bid on the Project.
Bidding Closed
6/30/23 2:00pm
RFP - Upper Lateral Rehabilitation Project #5 (CIP 20701)
Bidding Closed
NapaSan
1515 Soscol Ferry Road
Engineer's Estimate: $190,000
Bidding Closed
3/21/23 2:00pm
2023-2024 Treatment Plan Improvement Project (CIP 22706)
Bidding Closed
NapaSan
Napa , CA
The general scope of work for this project includes replacement of two primary clarifier drives and two secondary clarifier metal componets, and a new secondary clarifier coating system. Also included in the scope of work is the replacement of the ferric chloride chemical storage tank, piping, valves, accessories, and coating system replacement; sodium bisulfite chemical storage tank, piping, valves, accessories, and coating system; RAS/WAS wetwell discharge elbows and piping; H-Pad piping valves and pipe coating system; secondary effluent pump station valves; and Pond 4 pump station valves.