West Napa Pump Station Redundancy Project CIP 23710
Project Description: Installation of a 3rd large submersible pump at the recently reconstructed West Napa Pump Station, which includes piping modifications and electrical and instrumentation work. Also included in the scope of work is the following: installation of a sump pump in the flowmeter vault, installation of safety grates, installation of lighting mounted to the solar structure, installation of door switches connected to SCADA, installation of bird netting for the underside of the solar structure, and installation of a platform for the existing odor control unit and generator.
Status
Bidding Closed
Prebid Date | 10/10/23 10:00am |
Bid Date | 10/31/23 2:00pm |
Company & Contacts
NapaSan
Gavin Glascott
gglascott@napasan.com
Location
Napa, Ca
Estimated Cost of Construction: $1,950,000
Mandatory Pre-Bid Conference: October 10th, 2023 at 10AM.