Project Description: The work includes rehabilitation of approximately 1,810 LF of 39-inch trunk sewer mains by Cured-In-Place Pipe (CIPP) lining and the rehabilitation of 5 trunk manholes within the project area. Also included in the scope of work as Bid Alternate B is the rehabilitation of approximately 910 LF of 39-inch trunk sewer mains by CIPP lining and the rehabilitation of 3 trunk manholes within the project area. Also included in the scope of work as Bid Alternate A and C is the use of non-styrene, no VOC CIPP resin for the CIPP lining work in the Base Bid and Bid Alternate B, respectively.

Status

Bidding Closed

Prebid Date 12/6/23 2:00pm
Bid Date 12/19/23 2:00pm

Company & Contacts

NapaSan
Michael Fitch  
707-258-6030

Location

Napa, CA

The estimated cost of construction for the Base Bid is $1,000,000. The estimated cost of construction for Bid Alternate B is $700,000.

A mandatory pre-bid conference will be held at 2:00 pm on December 6, 2023 on Microsoft Teams via the link or meeting ID and passcode as provided below:

 

https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDVkZWI1MTgtNTdmZi00NDk4LTg1NzktNjQxYmRjYzNkM2Q3%40thread.v2/0?context=%7b%22Tid%22%3a%228966ba07-3d47-4447-a9cf-28c75b10802d%22%2c%22Oid%22%3a%2275caccde-65fa-4840-aac5-f1b9935cad42%22%7d

 

Meeting ID: 262 291 873 827

Passcode: 994mvg