North Napa Trunk Rehabilitation Phase 1 - CIP (23704)
Project Description: The work includes rehabilitation of approximately 1,810 LF of 39-inch trunk sewer mains by Cured-In-Place Pipe (CIPP) lining and the rehabilitation of 5 trunk manholes within the project area. Also included in the scope of work as Bid Alternate B is the rehabilitation of approximately 910 LF of 39-inch trunk sewer mains by CIPP lining and the rehabilitation of 3 trunk manholes within the project area. Also included in the scope of work as Bid Alternate A and C is the use of non-styrene, no VOC CIPP resin for the CIPP lining work in the Base Bid and Bid Alternate B, respectively.
Status
Bidding Closed
Prebid Date | 12/6/23 2:00pm |
Bid Date | 12/19/23 2:00pm |
Company & Contacts
NapaSan
Michael Fitch
707-258-6030
Location
Napa, CA
The estimated cost of construction for the Base Bid is $1,000,000. The estimated cost of construction for Bid Alternate B is $700,000.
A mandatory pre-bid conference will be held at 2:00 pm on December 6, 2023 on Microsoft Teams via the link or meeting ID and passcode as provided below:
Meeting ID: 262 291 873 827
Passcode: 994mvg