2025 Collection System Rehabilitation Project

Status

Bidding Closed

Prebid Date 10/29/24 10:00am
Bid Date 11/20/24 2:00pm

Company & Contacts

NapaSan
Gavin Glascott  
707-258-6012

Location

Napa, CA

The general scope of work for this project included in the base bid and bid alternate is the rehabilitation and/or replacement of 6”, 8”, 10”, 12”, 14”, 16”, and 20” sewer mains by the following methods:

• Approximately 35,089 LF by cured in place pipe (CIPP) lining

Also included in the scope of work is the rehabilitation or replacement of approximately 619 laterals and installation of approximately 605 top hats and 248 cleanouts, and removal and replacement of approximately 6 flush holes.

Estimated Cost of Construction: $4.4 Million Base Bid , $780,000 Bid Alt.